For a catalogue product with minor changes, one or two sample rounds are usually enough. With specification changes (voltage, language, colour) two or three are normal. More than three usually points to an unclear specification or a factory that does not correct. Each round to Latin America adds the time to prepare the sample, the courier and the review.
Fourth sample of the same toaster. The colour is right now, but the timer no longer matches the spec sheet.
When one round fixes one thing and breaks another, the problem usually sits before the sample.
What is normal for each case
| Product type | Usual rounds |
|---|---|
| Catalogue item, no changes | One |
| Catalogue item with your plug, language or colour | One or two |
| Changes to function or design | Two or three |
| New development with a mould | Several, with prototypes first |
What each round adds
- The factory's days to prepare the sample.
- International courier to your country.
- Customs clearance of the sample.
- Your testing days and the written reply.
How to shorten the rounds
- Send a complete spec sheet before the first sample.
- Answer each round with a numbered list of changes and photos.
- Ask for photos and video of the corrected sample before it ships.
- Have the sample checked in China when the change is simple, and ship only the final one.
The last round produces the reference sample. It is sealed, signed and kept to compare every order.
Frequently asked questions
Are samples paid for?
Almost always, along with the courier; some factories deduct the cost from the first order.
Can I review the sample without bringing it over?
Yes, with an agent in China who tests it against the spec sheet.



